首页> 外国专利> come to big hike for road bridges and viaducts.

come to big hike for road bridges and viaducts.

机译:来远足公路桥梁和高架桥。

摘要

the found is a time dilation to great hike for bridges.it comprises: - two plates of metal continuity of the transit plan, put in correspondence of structural details, which are linked in such a way that,interacting with structural elements below.find below two rooms: a load-bearing structure in correspondence with the gate structure to support a plan of deformable transit; the backbone of the deformable floor is bindingta and zipper to an extreme structural and, in correspondence of the other extreme, underpinning.flows below the plate at the same time, the transit in support for this; a floor conveniently on the deformable structure below.you can scroll and outlet in the opposite to the previous one.the feature of the found is in operation to double bayonet contrasted with easy flow to disappearance.
机译:发现是对桥梁进行大幅爬升的时间膨胀。它包括:-运输计划的两块金属连续性板,与结构细节相对应,以这种方式链接,从而与下面的结构元素相互作用。两个房间:与门结构相对应的承重结构,以支撑可变形的运输计划;可变形地板的主干将拉链和拉链固定在一个极端的结构上,并在另一个极端的情况下将其支撑在板下方。在下面的可变形结构上方便地放置地板。您可以在与前一个相反的位置滚动和退出。发现的功能是在操作中使用双刺刀,而容易流失。

著录项

  • 公开/公告号IT1261788B

    专利类型

  • 公开/公告日1996-06-03

    原文格式PDF

  • 申请/专利权人 MARNETTO ROBERTO;

    申请/专利号IT1993RM00417

  • 发明设计人 MARNETTO ROBERTO;

    申请日1993-06-24

  • 分类号6E01DA;

  • 国家 IT

  • 入库时间 2022-08-22 03:52:06

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号