(57) Abstract Objective The concrete placing facilities aspect is according to configuration or, howWhether when you inspect, simultaneously, scraping-off the placing surface which is too high, facilitiesTry to be able to state clearly the fixed aspect. Constitution You use vertically, in lower part of tube itself 1 horizontallyRotary ma which turns, digs the not yet hardening concrete placing facilities aspect Fka 2 is provided. Furthermore it thrusts into the not yet hardening concreteThe searching which possesses bottom 3 it is deep 5 from rotary marker 2 to the lower part protrudingOut by possibly providing in computer 1, in the foundation of the placing aspect FComputer 1 applying, to support, in the state rotary marker 2 the configuration aspectTarget 6 in order to adjust is provided on top of computer 1.
展开▼