首页> 外国专利> Application manner of the steel pipe pole string earth retaining wall and is used for that yatsutoko

Application manner of the steel pipe pole string earth retaining wall and is used for that yatsutoko

机译:钢管杆弦土挡土墙的应用方式,用于八子

摘要

PURPOSE:To increase work efficiency by connecting a pliers to the upper part of a steel pipe pile placed in a pliers loading longitudinal hole, burying the steel pipe pile in a specific position until the head of the pliers is positioned in the vicinity of the surface of the earth, and separating the pliers from the steel pipe pile. CONSTITUTION:A pile 1 is hung in an longitudinal hole (H) with a diameter large than that of the steel pipe pile 1, and a pliers 10 is connected to the upper part of the pile 1. After that, the pile 1 connected to the pliers 10 is subsequently buried into the specific ground provided with a soil cement column to construct a steel pipe column strip retaining wall and, at the same time, the pile 1 is fixed to the inside of the soil cement column. The pliers 10 is separated from the pile 1 to draw it from the ground (G), and after carrying out the primary excavation l1 to the extent of the ceiling end position of the pile 1, the secondary excavation l2 of a specific side of a retaining wall (W) is carried out. Accordingly, fitting and release of the pliers 10 to/from the pile 1 is made easily, and work efficiency can be increased.
机译:目的:通过将钳子连接到放置在钳子加载纵向孔中的钢管桩的上部来提高工作效率,将钢管桩埋在特定位置,直到钳子的头部位于地面附近并从钢管桩中分离出钳子。构成:将桩1悬挂在直径大于钢管桩1直径的纵向孔(H)中,并在桩1的上部连接一个钳子10。然后,将桩1连接至随后,将钳子10埋入设置有土壤水泥柱的特定地面中,以构造钢管柱带状挡土墙,同时,将桩1固定在土壤水泥柱的内部。钳子10与桩1分开,以将其从地面(G)拉出,并且在进行一次挖掘l1至桩1的最高端位置的程度之后,对桩1的特定侧进行二次挖掘l2。进行挡土墙(W)。因此,易于将钳子10安装到桩1上和从桩1上松开,并且可以提高工作效率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号