Reconstruction application modulo null of in operation

机译:重构应用中操作的模空值

摘要

PURPOSE:To prevent the delay of the production activity in reconstruction by constructing foundation and outer peripheral pillars which are newly constructed on the outer periphery of an already constructed building and laying a slide rail on the pillar top and construct the upper storied layer, using the slide rail as material carrying inlet. CONSTITUTION:A foundation 3 and outer peripheral pillars 4 are constructed on the outer periphery of an already constructed structure 1, and a bracket 5 is installed in the vicinity of a pillar head, and a slide rail 7 is laid. The rail is laterally extended on a working frame base, and a roof or a two-storied floor 9 is constructed, and the construction or the outer decoration work for the upper floor story 9 are executed, using the above-described roof or the two-storied floor 9 as working space and material transport port, and an inside foundation 10 and intermediate pillars 11 are newly installed inside the already constructed building 1, and the outer decoration work, etc., are executed. Then, the already constructed building 1 is disassembled, and the inside is repaired. Accordingly, the repair and disassembly work for the already constructed building can be executed safely, carrying out the ordinary work.
机译:目的:为防止重建过程中生产活动的延误,通过在已经建造的建筑物的外围建造新建造的基础和外围支柱,并在支柱顶部铺设滑轨并构造上层存储层,使用滑轨作为进料口。构成:在已经建造的建筑物1的外周上建造了基座3和外围立柱4,在立柱头附近安装了支架5,并铺设了滑轨7。轨道在工作框架基座上横向延伸,并构造了屋顶或两层楼板9,并且使用上述屋顶或两层楼板来执行上层楼层9的构造或外部装饰工作用作工作空间和材料输送口的多层地板9,以及在已建成的建筑物1的内部新安装内部基础10和中间支柱11,并执行外部装饰工作等。然后,拆卸已经建造的建筑物1,并修理内部。因此,可以安全地执行已经建造的建筑物的修理和拆卸工作,从而执行普通工作。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号