首页>
外国专利>
Reconstruction application modulo null of in operation
Reconstruction application modulo null of in operation
展开▼
机译:重构应用中操作的模空值
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To prevent the delay of the production activity in reconstruction by constructing foundation and outer peripheral pillars which are newly constructed on the outer periphery of an already constructed building and laying a slide rail on the pillar top and construct the upper storied layer, using the slide rail as material carrying inlet. CONSTITUTION:A foundation 3 and outer peripheral pillars 4 are constructed on the outer periphery of an already constructed structure 1, and a bracket 5 is installed in the vicinity of a pillar head, and a slide rail 7 is laid. The rail is laterally extended on a working frame base, and a roof or a two-storied floor 9 is constructed, and the construction or the outer decoration work for the upper floor story 9 are executed, using the above-described roof or the two-storied floor 9 as working space and material transport port, and an inside foundation 10 and intermediate pillars 11 are newly installed inside the already constructed building 1, and the outer decoration work, etc., are executed. Then, the already constructed building 1 is disassembled, and the inside is repaired. Accordingly, the repair and disassembly work for the already constructed building can be executed safely, carrying out the ordinary work.
展开▼