THIS PROCEDURE, ACCORDING TO WHICH mate, continuously, elements for lifting CONSTITUTE SCRAPS WORK INTENDED TO BE PLACED THEMSELVES end to end to form the work in question is to use elements (6) having SOLID MEDIA HITCH (20) projecting from the walls and align with each other when cut WORK (4) are placed end to end, pLACING AT LEAST ONE TOUGH longitudinal element (21) which rests on said engagement means (20) And then flood the assembly formed by the engaging elements (20) and the element LONGITUDINAL (21) WITH Poured (26).
展开▼