首页> 外国专利> Method for installing tapered piles, tapered piles, and foundation structures made with these piles

Method for installing tapered piles, tapered piles, and foundation structures made with these piles

机译:锥形桩的安装方法,锥形桩及由这些桩制成的基础结构

摘要

The piles (1) decrease in size in direction of setting. They are subjected to vibrations (9), to and fro in longitudinal pile direction, and in this way are driven into the ground (2) until they reach a position, which is slightly short of their final position. The vibrations are stopped, and a pressure or traction force (10), free of vibrations, and acting in direction of insertion, is applied to the pile, until it is held in the ground with a certain prestress. Initially, each pile is drawn or pressed into the ground over part (5) of its length, without vibrations, which are applied after this process. The piles consist of concrete and decrease in size conically or in an arch-shape.
机译:桩(1)的尺寸沿坐封方向减小。它们在纵向桩方向上来回振动(9),并以此方式被打入地面(2),直到它们到达一个比其最终位置略短的位置。停止振动,并向桩施加无振动且沿插入方向作用的压力或牵引力(10),直到桩以一定的预应力保持在地面上为止。最初,将每个桩在其长度的一部分(5)上拉入或压入地面,而不会产生振动,此过程之后会施加振动。桩由混凝土组成,并呈锥形或拱形减小尺寸。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号