首页> 外国专利> Tunnel jumbo of drilling control device

Tunnel jumbo of drilling control device

机译:隧道钻进控制装置

摘要

(57) Abstract Objective Approaching to fence hole position, position of the guide shellTo do the deciding and the fence hole manipulation of the rock drill, tunnel JohnIt improves the fence hole precision of bo. Constitution The rock drill 2 which is loaded onto the guide shell 3 and,The boom 4 for the fence hole which supports the guide shell 3 and registersWith, the tunnel jumbo J which has with the cage 7 for jobIn order on computer side and cage side, to manipulate rock drill 2,The rock drill function part and in order to manipulate the boom for the fence holeThe boom function part for the fence hole and the fence hole manual operating device 6 which consists of facilitiesThe ke te it is.
机译:(57)<摘要> <目的>接近围栏孔的位置,导向壳体的位置为了确定凿岩机的围岩孔和围栏孔的操作,隧道JohnIt提高了bo的围栏孔精度。 <构成>装载在导向壳体3上的凿岩机2,支承导向壳体3的栅栏用起重臂4和配准的,具有用于作业的笼子7的隧道巨型J在计算机侧和笼侧,操纵凿岩机2,凿岩机功能部件和操纵围栏孔的起重臂围栏孔的起重臂功能部分及围栏孔手动操作装置6由设施组成。

著录项

  • 公开/公告号JP2561763Y2

    专利类型

  • 公开/公告日1998-02-04

    原文格式PDF

  • 申请/专利权人 古河機械金属株式会社;

    申请/专利号JP19910086072U

  • 发明设计人 浦野 米治;

    申请日1991-10-22

  • 分类号E21C11/02;

  • 国家 JP

  • 入库时间 2022-08-22 03:01:49

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号