首页> 外国专利> Soil cement cylinder string earth retaining wall and its construction manner

Soil cement cylinder string earth retaining wall and its construction manner

机译:水泥土筒柱土挡墙及其施工方式

摘要

PURPOSE: To eliminate a filling process between a batholith improvement body and a retaining wall for a soil cement column row, and even shorten a construction period by drilling the body and constructing the wall therein. ;CONSTITUTION: A batholith improvement body 1 constituting an excavated bottom 6 is laid in advance, covering an area up to a position where a surrounding earth retaining wall for a soil cement column row, via the application of the deep mixing method of soil stabilization. After the body 1 is laid, soil around the periphery thereof is drilled with an excavator having a small drilling diameter multi-shaft. Furthermore, cement milk, while being fed, is agitated and mixed to surround the body 1, and the retaining wall 2 is constructed therein. In this case, a member to resist earth pressure generated during bottom excavation, for example, H-section steel is inserted in the structure of the wall 2.;COPYRIGHT: (C)1995,JPO
机译:用途:消除了在基岩改良剂主体和用于水泥土柱排的挡土墙之间的填充过程,甚至通过在主体上钻孔并在其中建造墙体来缩短施工时间。组成:预先铺设构成挖底6的基岩改良体1,通过应用土壤稳定化的深层混合法,覆盖直至水泥土柱排土围墙的位置。放置主体1之后,用钻直径较小的多轴挖掘机在其周围钻土。此外,在喂入的同时搅拌和混合水泥乳以包围主体1,并且在其中构造了挡土墙2。在这种情况下,将抵抗底部挖掘过程中产生的土压力的构件(例如H型钢)插入墙体2的结构中。版权所有:(C)1995,JPO

著录项

  • 公开/公告号JP2726615B2

    专利类型

  • 公开/公告日1998-03-11

    原文格式PDF

  • 申请/专利权人 TENOTSUKUSU KK;

    申请/专利号JP19930310474

  • 发明设计人 FUKUDA ATSUO;

    申请日1993-12-10

  • 分类号E02D5/20;

  • 国家 JP

  • 入库时间 2022-08-22 03:00:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号