首页> 外国专利> METHOD OF USING CONSTRUCTION GRADE CEMENT IN OIL AND GAS WELLS

METHOD OF USING CONSTRUCTION GRADE CEMENT IN OIL AND GAS WELLS

机译:在油气井中使用建筑级水泥的方法

摘要

A method of cementing an oil and gas wellbore is accomplished by mixing togetherblast furnace slag, construction grade cement and water to form a pumpable slurry. Theslurry is then pumped to a selected location within an oil and gas well and allowed tosolidify within the wellbore. The blast furnace slag alters the properties of the constructiongrade cement so that it can be used in the construction of oil and gas wells, where it wouldotherwise not be feasible to use. The blast furnace slag enhances the physical and chemicalproperties of the construction grade cement, increasing gel times and decreasing fluid loss.
机译:通过将高炉矿渣,建筑级水泥和水混合在一起以形成可泵送的泥浆来完成水泥固井的方法。的然后将浆液泵送到油气井内的选定位置,并允许在井眼内固化。高炉矿渣改变了建筑的性能等级的水泥,以便可以在油气井的建设中使用否则将无法使用。高炉矿渣提高了物理和化学性能建筑级水泥的特性,增加胶凝时间并减少流失。

著录项

  • 公开/公告号CA2183414A1

    专利类型

  • 公开/公告日1998-02-16

    原文格式PDF

  • 申请/专利权人 BJ SERVICES COMPANY;

    申请/专利号CA19962183414

  • 发明设计人 DI LULLO ARIAS GINO F.;

    申请日1996-08-15

  • 分类号C04B18/14;E21B33/13;

  • 国家 CA

  • 入库时间 2022-08-22 02:54:16

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号