首页> 外国专利> WORKING MACHINE AND WORKING METHOD FOR UNDERGROUND FOUNDATION PILE

WORKING MACHINE AND WORKING METHOD FOR UNDERGROUND FOUNDATION PILE

机译:地下基础桩的施工机械及施工方法

摘要

The pile carrying out method is comprised of (a) excavating the ground with an auger(4) rotated owing to driving of a driving apparatus(3) installed in a leader(2); (b) injecting the mortar(9) into the excavated ground a little after excavation until a excavation bit(7) installed in a lower end of the auger reaches supporting layer(8); (c) lowering vertically a pile to the supporting layer, inserting it into the interior of the cavity part of the auger so that the mortar can be diffusion-penetrated into the space around the supporting layer by the falling load of the pile; (d) getting the auger to backlash to get back.
机译:桩的实施方法包括:(a)由于安装在引导件(2)中的驱动装置(3)的驱动而旋转的螺旋钻(4)挖掘地面; (b)在开挖后稍稍将砂浆(9)注入开挖的地面,直到安装在螺旋钻下端的开挖钻头(7)到达支撑层(8); (c)将一堆桩垂直地放到支撑层上,将其插入到螺旋钻的空腔部分的内部,以便在该桩的下落载荷作用下,砂浆可以扩散渗透到支撑层周围的空间中; (d)使螺旋钻反弹并返回。

著录项

  • 公开/公告号KR0123886B1

    专利类型

  • 公开/公告日1997-11-25

    原文格式PDF

  • 申请/专利权人 JUNG WON-KYU;GAWOO CONSTRUCTION CO.LTD;

    申请/专利号KR19940008446

  • 发明设计人 JUNG WON-KYU;

    申请日1994-04-21

  • 分类号E02D5/46;

  • 国家 KR

  • 入库时间 2022-08-22 02:48:45

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号