首页> 外国专利> Large-scale bridge superstructure batch installation device

Large-scale bridge superstructure batch installation device

机译:大型桥梁上部结构批量安装装置

摘要

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a presidential bridge construction apparatus, wherein the first front pants (1) and the second front pants (2) and the pair of front pants (1, 2) are arranged in parallel with a predetermined width interval in front. And the barge part 5 consisting of a first rear pants 3 and a second rear pants 4, which are arranged in a pair of rear pants 3 and 4 in parallel with a predetermined length interval, and the first front A front transport vent (7) disposed on the intermediate deck (6) of the pants (1) and the second front pants (2), which are established while firmly engaging the front pants (1,2); A rear conveying vent 9 disposed on an intermediate deck 8 of the rear pants 3 and the second rear pants 4 and standing up while firmly engaging the rear pants 3 and 4; The first tie frame 10 which firmly connects the first front pants 1 and the first rear pants 3, and the second front pants 2 and the second rear pants 4 are firmly connected to each other. Is composed of a second tie frame 11, a structure that allows to transport a large amount of objects to the pants (1, 2, 3, 4) of small capacity, the upper structure 18 is easy to work on land After assembling in the ships to the transport vents of the pants transported to the bridge construction position to be placed on the bridge (19) collectively, the assembly of the superstructure 18 on the land to improve the quality of the bridge superstructure 18 The pants (1, 2, 3, 4) can be transported smoothly even in shallow waters, and the bridge superstructure (18) is assembled independently of other bridge substructures. There is an advantage to shorten the period.
机译:总统桥构造设备技术领域本发明涉及一种总统桥构造设备,其中布置第一前裤(1)和第二前裤(2)以及一对前裤(1、2)。与前面的预定宽度间隔平行。驳船部5由第一后裤3和第二后裤4以及第一前A前输送口7构成,第一后裤3和第二后裤4以预定的长度间隔平行地布置在一对后裤3和4中。设置在裤子(1)和第二前裤子(2)的中间甲板(6)上,它们牢固地接合前裤子(1,2);后输送口9设置在后裤3和第二后裤4的中间甲板8上,并且在牢固地接合后裤3和4的情况下直立。将第一前裤1和第一后裤3牢固地连接的第一领带框架10以及第二前裤2和第二后裤4被牢固地彼此连接。由第二领带架11组成,该结构允许将大量物体运送到小容量的裤子(1、2、3、4),上部结构18易于在陆地上作业。运送到裤子的运输通风口,这些裤子被运送到桥梁的施工位置,共同放置在桥梁(19)上,上部结构18在地面上的组装提高了桥梁上部结构18的质量裤子(1、2、2 3、4)即使在浅水中也能顺利运输,并且桥梁上部结构(18)的组装独立于其他桥梁下部结构。缩短周期是有好处的。

著录项

  • 公开/公告号KR19980020866A

    专利类型

  • 公开/公告日1998-06-25

    原文格式PDF

  • 申请/专利权人 김광명;

    申请/专利号KR19960039526

  • 发明设计人 심옥진;조성웅;박정일;이원표;

    申请日1996-09-12

  • 分类号E01D6/00;

  • 国家 KR

  • 入库时间 2022-08-22 02:48:32

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号