首页>
外国专利>
Early Improvement Method of Dredged Soft Ground by Using Floating Mat Slab for Improvement Equipment of Dredged Soft Ground and Its Articles
Early Improvement Method of Dredged Soft Ground by Using Floating Mat Slab for Improvement Equipment of Dredged Soft Ground and Its Articles
展开▼
机译:浮垫板疏for软土地基改良设备的疏Soft软土地基早期改良方法及其制品
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention is simple and easy to install construction for the promotion of dehydration, such as installing a pleated drainage pipe for vertical drainage and horizontal drain for the early improvement of the dredged soil soft ground in the liquid state of the dredged dumping site The present invention relates to a method for the early improvement of dredged soil ground using the floating mat slab for the improvement of dredged soil ground which has been proposed to facilitate and facilitate the dredged soil ground.
展开▼