首页> 外国专利> CONSTRUCTION METHOD OF PORT DISTRICT STRUCTURE AT THE POOR SUBSOIL

CONSTRUCTION METHOD OF PORT DISTRICT STRUCTURE AT THE POOR SUBSOIL

机译:劣质土壤港区结构的施工方法

摘要

Here is provided a building method for marine structures such as breakwater, berth, and so on which enables cheap construction expenses, reduced construction period, high stability, no chemical treatment, and no environmental pollution. Caissons (2,3) manufactured on land in advance, are established on weak ground at designated locations in order to build marine structures. After that, caissons are pierced in to weak layer (A) by their own weight to the gravel layer (B) or base rock (C), porous pipes equipped with injection holes (15) subside in weak layer within caissons, then stone and gravel are thrown in the weak layers of inside caissons making marine structures complete.
机译:这里提供了一种用于诸如防波堤,泊位等海洋结构的建造方法,其能够实现廉价的建造费用,缩短的建造周期,高稳定性,无需化学处理并且对环境没有污染。预先在陆地上制造的沉箱(2,3)在指定位置的较弱地面上建立,以建造海洋结构。之后,沉箱通过自重穿入薄弱层(A)到砾石层(B)或基岩(C),带有注水孔(15)的多孔管沉入沉箱中的薄弱层,然后用石头和砾石被扔入内部沉箱的薄弱层中,使海洋结构完整。

著录项

  • 公开/公告号KR0130745B1

    专利类型

  • 公开/公告日1998-04-10

    原文格式PDF

  • 申请/专利权人 SONG BYUNG-MOO;

    申请/专利号KR19930018399

  • 发明设计人 SONG BYUNG-MOO;

    申请日1993-09-14

  • 分类号E02D17/18;E02D23/00;

  • 国家 KR

  • 入库时间 2022-08-22 02:47:32

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号