首页> 外国专利> METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS

METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS

机译:不稳定水饱和地基中地下工程的施工方法

摘要

FIELD: construction, particular, methods of construction of underground workings in unstable water-saturated grounds. SUBSTANCE: method includes establishment of ice-ground guard and driving of underground working with installation of support. The method is distinguished by the fact that ice-ground guard is defrosted along the axis of underground working by parts multiple to length of lining ring, then, thawed incoherent ground is solidified by injections by separate parts. EFFECT: higher efficiency. 1 dwg
机译:领域:建筑,特别是在不稳定的水饱和地面中地下工程的建筑方法。物质:方法包括建立冰面保护层,并通过安装支架来驱动地下作业。该方法的特征在于,沿地下工作轴线除以衬圈长度的倍数的部分来解冻冰地防护层,然后通过分开的部分注入使融化的非相干地面固化。效果:更高的效率。 1载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号