首页>
外国专利>
METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS
METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS
展开▼
机译:不稳定水饱和地基中地下工程的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: construction, particular, methods of construction of underground workings in unstable water-saturated grounds. SUBSTANCE: method includes establishment of ice-ground guard and driving of underground working with installation of support. The method is distinguished by the fact that ice-ground guard is defrosted along the axis of underground working by parts multiple to length of lining ring, then, thawed incoherent ground is solidified by injections by separate parts. EFFECT: higher efficiency. 1 dwg
展开▼