首页> 外国专利> PROCESS OF ERECTION OF LARGE-SIZED HEAVY MEMBERS OF BUILDINGS AND STRUCTURES

PROCESS OF ERECTION OF LARGE-SIZED HEAVY MEMBERS OF BUILDINGS AND STRUCTURES

机译:建筑物和结构的大型重型构件的竖立过程

摘要

FIELD: construction industry. SUBSTANCE: after lift of large-sized heavy member by cranes it is moved by alternating and simultaneous operation of cranes with decrease and increase of overhangs of suspension points and member to ropes with simultaneous turn of booms by method which key technique is synchronism of operation of cranes with parallel transport of weight and verticality of hoisting ropes of cranes. Mentioned method provides for verticality of hoisting ropes of tower cranes. EFFECT: enhanced efficiency and precision of process. 2 dwg
机译:领域:建筑业。实质:用起重机吊装大型重型构件后,通过交替和同时操作起重机,使悬吊点和构件的悬垂量增加和减小,同时通过吊杆同时转动吊臂将其移动,其关键技术是同步操作平行运输起重机的起重绳索的重量和垂直度的起重机。所提及的方法提供了塔式起重机的提升绳索的垂直性。效果:提高了流程的效率和精度。 2 dwg

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号