首页>
外国专利>
PROCEDURES AND PREPARATION FOR INCREASED EXPLOITATION OF METEOR OR REGENERAL WATER FROM DIRECTORS AND PLANTS OF REFRIGERATED STEEL CAPACITY
PROCEDURES AND PREPARATION FOR INCREASED EXPLOITATION OF METEOR OR REGENERAL WATER FROM DIRECTORS AND PLANTS OF REFRIGERATED STEEL CAPACITY
展开▼
机译:增加制冷能力的董事和工厂对流水或再生水的开采的方法和准备
展开▼
页面导航
摘要
著录项
相似文献
摘要
PCT No. PCT/CH93/00165 Sec. 371 Date Feb. 18, 1994 Sec. 102(e) Date Feb. 18, 1994 PCT Filed Jun. 29, 1993 PCT Pub. No. WO94/00653 PCT Pub. Date Jan. 6, 1994.In order to retain water on the roofs of buildings with a water-retention basin, a vortex-type throttle valve is to be fitted on the flat roof and is to be connected to a drain pipe leading to a drain. The throttle valve makes it possible to control the rainwater run-off at a given rate determined by the size of the throttle valve. If rain falls at a high rate, the excess is retained. Overflow protection is provided by fitting on top of the throttle, a length of pipe which permits the unrestricted flow of water through the throttle valve. Alternatively, the drain pipe can be extended upwards to the maximum permitted water-retention level, thus allowing the water which exceeds this level to pass directly into the drain pipe.
展开▼