首页> 外国专利> IMPERMEABLE WORK METHOD FOR UNDERGROUND STRUCTURE BY IMPERMEABLE WALL AND SLIGHTLY PERMEABLE BOTTOM BASE

IMPERMEABLE WORK METHOD FOR UNDERGROUND STRUCTURE BY IMPERMEABLE WALL AND SLIGHTLY PERMEABLE BOTTOM BASE

机译:防渗墙和低渗透底基的地下结构防渗方法

摘要

PROBLEM TO BE SOLVED: To secure dry work and prevent floating of an underground structure by creating a lower slightly permeable bottom base at a particular lower position from the upper slightly permeable bottom base created at the deeper position from the underground structure. SOLUTION: A grid-shaped beam 2c for connecting inner and outer impermeable walls 2a, 2b in the ground consisting of sand gravel layer with a high permeability and a shallow groundwater level is built, thereafter, the impermeable walls 2a, 2b are built. Then, an upper slightly permeable bottom base 1a is built at a position deeper than the underground structure B, a lower slightly permeable bottom base 1b having a plan shape larger than that of the upper slightly permeable bottom base 1a is creased at a position lower by layer thickness of a drain layer from the upper slightly permeable bottom base 1a. Then, for each closed portion surrounded by the inner and outer impermeable walls 2a, 2b and grid-shaped beam 2c, the groundwater level is lowered by a water pumping-up well 4 provided to a depth reaching a water drain layer A", thereafter, the ground surrounded by the upper slightly permeable bottom base 1a and the inner impermeable wall 2a is excavated and the underground structure B is constructed.
机译:要解决的问题:通过在地下结构较深位置的上部略透性底部基座的特定较低位置处创建下部略透性的底部基座,以确保干燥工作并防止地下结构浮起。解决方案:建造一个网格状的梁2c,用于连接由高渗透性和浅水位的砂砾层组成的地下内外渗透壁2a,2b,然后构建不渗透壁2a,2b。然后,在比地下结构B更深的位置处构造上部略透底部基体1a,在比下部略透底部基体1a大的平面形状的下部略透底部基体1b的下方位置折痕。从上层略微可渗透的底部基底1a开始的漏极层的层厚。然后,对于由内,外不渗透壁2a,2b和网格状梁2c围绕的每个封闭部分,通过设置到排水层A”的深度的抽水井4来降低地下水位,此后然后,挖出由上部略透性底部基底1a和内部不透水壁2a包围的地面,并构造地下结构B。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号