首页> 外国专利> OPERATION CONTROLLING DEVICE FOR TWO-STAGE PUMPED STORAGE POWER PLANT

OPERATION CONTROLLING DEVICE FOR TWO-STAGE PUMPED STORAGE POWER PLANT

机译:二级抽水蓄能电站的运行控制装置

摘要

PROBLEM TO BE SOLVED: To allow a combined operation without manual action. SOLUTION: A power controlling device 10A outputs load command signals to load controlling devices 8, 9 with distributing the signals so that a water level signal of an intermediate pond 2 is in a desired level and summation of power output signals from service machines is total load requirement output signal, and outputs the load command signals to the load controlling devices 8, 9 so that they can control a test machine. An operation controlling device 20 outputs load command signals of the registered test machine and the total load requirement output signal to the power controlling device 10A, and, during load adjusting operation by a feed control station, outputs the total load requirement output signal, which is increased or decreased by load adjusting signal amount inputted to the load command signals of the test machine and the total load requirement output signal, to the power controlling device 10A.
机译:解决的问题:无需人工操作即可进行组合操作。解决方案:功率控制设备10A通过分配信号向负载控制设备8、9输出负载命令信号,以使中间池2的水位信号处于所需的水平,并且来自服务机器的功率输出信号的总和为总负载要求输出信号,并将负载指令信号输出到负载控制装置8、9,以便它们可以控制测试机。运转控制装置20将登记的试验机的负荷指令信号和总负荷要求输出信号输出至动力控制装置10A,在进给控制站进行负荷调整时,输出总负荷要求输出信号,即总负荷要求输出信号。通过输入到试验机的负载指令信号的负载调整信号量和总负载需求输出信号而增加或减少到电力控制装置10A。

著录项

  • 公开/公告号JPH11173252A

    专利类型

  • 公开/公告日1999-06-29

    原文格式PDF

  • 申请/专利权人 TOSHIBA CORP;

    申请/专利号JP19970362399

  • 发明设计人 KUZUU MITSUO;KANEZAKI YUJI;

    申请日1997-12-12

  • 分类号F03B15/04;F03B15/02;H02P9/00;H02P9/04;

  • 国家 JP

  • 入库时间 2022-08-22 02:35:48

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号