首页>
外国专利>
Super structure null of absorption band opening of absorption band pillar section of corks dry quenching
Super structure null of absorption band opening of absorption band pillar section of corks dry quenching
展开▼
机译:软木塞的吸收带柱段的吸收带开口超结构无效
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To increase the gas flow rate and the coke cooling effect and prevent the cracking, slipping out, and falling down of bricks by installing a curved- surface jack arch having the same circular center as that of a partition wall as the upper part of a suction zone opening. ;SOLUTION: The figure is an oblique view illustrating the upper part of a suction zone opening supported from the undeside by s support member. The sectional area of the opening is increased by installing a jack arch having a curved bottom surface and having the same circular center as that of a partition wall 7. A suction zone pillar part 8 is repaired as follows: after coke inside a coke dry-quenching apparatus is discharged, a work deck 12 is installed under the partition wall 7; a support member 13 comprising a jack 15, a rodlike support material 16, and a crown frame 17 is installed on the deck 12 by successively placing the jack 15, etc.; then the support member is jacked up to such a height that the upper surface of the crown frame 17 is brought into contact with the underside of the partition wall 7 and that the member 13 can bear the load of the partition wall 7; and the repair is done.;COPYRIGHT: (C)1998,JPO
展开▼