Super structure null of absorption band opening of absorption band pillar section of corks dry quenching

机译:软木塞的吸收带柱段的吸收带开口超结构无效

摘要

PROBLEM TO BE SOLVED: To increase the gas flow rate and the coke cooling effect and prevent the cracking, slipping out, and falling down of bricks by installing a curved- surface jack arch having the same circular center as that of a partition wall as the upper part of a suction zone opening. ;SOLUTION: The figure is an oblique view illustrating the upper part of a suction zone opening supported from the undeside by s support member. The sectional area of the opening is increased by installing a jack arch having a curved bottom surface and having the same circular center as that of a partition wall 7. A suction zone pillar part 8 is repaired as follows: after coke inside a coke dry-quenching apparatus is discharged, a work deck 12 is installed under the partition wall 7; a support member 13 comprising a jack 15, a rodlike support material 16, and a crown frame 17 is installed on the deck 12 by successively placing the jack 15, etc.; then the support member is jacked up to such a height that the upper surface of the crown frame 17 is brought into contact with the underside of the partition wall 7 and that the member 13 can bear the load of the partition wall 7; and the repair is done.;COPYRIGHT: (C)1998,JPO
机译:要解决的问题:通过安装一个弯曲的千斤顶拱形件,该拱形拱形件的中心与分隔壁的圆心相同,以提高气体流量和焦炭冷却效果并防止砖的开裂,滑落和掉落。抽吸区开口的上部。 ;解决方案:该图是斜视图,显示了从下方通过支撑部件支撑的抽吸区开口的上部。开口的截面积通过安装具有弧形底面并具有与分隔壁7相同的圆心的千斤顶拱来增加。吸气区支柱部分8的修复方法如下:在焦炭内部干焦后,排放淬火装置,在分隔壁7的下方安装工作台12。通过依次放置千斤顶15等,将包括千斤顶15,杆状支撑材料16和冠状框架17的支撑构件13安装在甲板12上。然后,将支撑构件顶起至使冠状框架17的上表面与分隔壁7的底面接触并且支撑构件13能够承受分隔壁7的负荷的高度。并完成了维修。;版权所有:(C)1998,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号