首页>
外国专利>
Underwater debris fundamental slope averaging construction method and that weight
Underwater debris fundamental slope averaging construction method and that weight
展开▼
机译:水下碎石基本边坡平均施工方法及重量
展开▼
页面导航
摘要
著录项
相似文献
摘要
Abstract Topic Averaging the excess weld metal slope of the underwater debris foundation is planned,It is according to slope gradient furthermore it does mechanically efficiently simply, it is denseWith. Solutions The for underwater debris fundamental slope averaging which depends on this inventionAs for the weight, metal tubing 9 and this metal tubing 9 putting in place necessary interval, enclosureWhen the cover 10 you establish lock in the surface of sabot 11 thatThose metal tubing inside 9 and cover 10 weight of sand and iron sand etcRestoration thing Wb, the weight head A which becomes, the hollow casingAdhering on the bottom of B, to be something which becomes, weight head A,This is hung, through hollow casing B, hanging to wire DWhen lowering, inclined angle of that sabot 11 the underwater debris foundationWay it agrees to the gradient of the slope Ca which C is planned beforehand, formationIt has done.
展开▼