首页>
外国专利>
Ridge structure, and present tile of present stacking ridge construction method and present stacking
Ridge structure, and present tile of present stacking ridge construction method and present stacking
展开▼
机译:垄结构,本叠砖的本瓦,本叠砖的施工方法及本叠
展开▼
页面导航
摘要
著录项
相似文献
摘要
Abstract Topic When the ridge it curves and is attached and facilities does the present stacking ridge (the presentStacking ridge construction method), the roof earth (it roofs, the earth) the tonnage or to roof, highAnd so on dust size and gradient adjustment of adjustment or present tile accuracyGoing, it is the configuration to roof. This roof earth and dust sun/sizeThe suitable skill is required to the adjustment of law and the like. In addition ridge questionWith u operation in height high-level technical skill to become necessary, at the same time dangerThe question, long-term conversion of thing or the term of works when it accompanies and soaring of application expenseThere is a subject. Solutions As for this invention, the base of the opposite which is provided in the roof earth of the ridgeTo do and to adjust sequential present tile height between the tiles sequence polyThe present tile of opposite of number facilities is done at the time of, adjustment of present tile heightDent and this present for the adjustment which has the tilt slant face of the present tileSliding connection of the pawl piece for adjustment of the other present tile which is laminated to the tile interestBusiness doing, to adjust, at the same time with stability projection of the present tile of opposite, stability installationIt is the configuration which is assured. Therefore, to be superior in earthquake-proof Characteristic endurance?The simplicity which it can cope effectively vis-a-vis the nature and other disastersAt the same time the beautiful ridge it curves and is attached and can offer present stacking ridge construction method.
展开▼