(57) Abstract Topic To designate the manipulation feel of control column 6 as satisfactory ones, wiring 7To designate the safety check as easy ones, at the same time, the taking attaching of control column 6The distribution cord of the ke and wiring 7 efficiency well can be done. SolutionsIn the embarkation floor 2 front part which is provided on machine casing 1, meta the pas which possesses distribution facilities se ru meter panel 3 on topFlannel post 4 stand facilities is done. This panel post 4 top towerPower with on machine casing 1 of floor 2 rear position, these paneReportage strike the vertical frame part of the front and back direction which concatenates with 4 and machine casing 1 andManipulation of the L die which is formed to one body by the rear standards section of lengthwiseFramework 5 is provided. Rear standards section of this manipulation framework 5 motive for action machine 10In the rear vicinity, the vertical frame part is laid out above motive for action machine 10. It is dense,In the vertical frame part of manipulation framework 5 each control column 6 which manipulates each device,As 6 is supported, above the vertical frame part of this manipulation framework 5The panel 23 which possesses switch 22 is provided. This manipulation frameworkIn 5, as you joint between the respective electrical items, meter panel 3Wiring 7 which reaches to meters paralleling to the manipulation framework 5 of L die, supportIt makes keep. Configuration of the manipulation machine casing of the combine which consists of above.
展开▼