首页> 外国专利> Installation and process for the production of pig iron and / or sponge iron.

Installation and process for the production of pig iron and / or sponge iron.

机译:生铁和/或海绵铁的生产安装和过程。

摘要

Invention Patent: B "INSTALLATION AND PROCESS FOR THE PRODUCTION OF CAST IRON AND / OR SPONGE IRON" D. An installation for the production of pig iron and / or sponge iron, comprising at least one fluid bed reactor (1, 2) for receiving fine ore, a reduction gas supply pipe (7) leading to this reactor fluidized bed (1, 2), a flue gas discharge pipe (8) from the fluidized bed reactor (1) and a discharge device (17), preferably a briquetting device (6), provided for the reduction product formed in the fluidized bed reactor (1, 2), the flue gas discharge pipe (8) from the fluidized bed reactor (1) flows into a cleaning device, such as a washer (9) and then then in a heating device (12, 13) and finally to the reducing gas supply pipe (7) of the fluidized bed reactor (1, 2). To produce a product that has a high quality standard with minimal energy consumption, the heating device is constituted in such a way that it comprises two stages and at least one heat exchanger (12) is provided as the heating device for the reducing gas and, connected in series with it, a partial combustion device (13) for the reducing gas with an oxygen supply device (16).
机译:发明专利:“生产铸铁和/或海绵铁的安装和过程” 。用于生产生铁和/或海绵铁的设备,包括至少一个用于接收细矿的流化床反应器(1、2),通向该反应器流化床(1、2)的还原气体供应管(7)。 ,来自流化床反应器(1)的烟气排放管(8)和用于形成在流化床反应器(1、2)中的还原产物的排放装置(17),优选为团块装置(6),来自流化床反应器(1)的烟气排放管(8)流入清洗设备,例如洗衣机(9),然后流入加热设备(12、13),最后到达还原气体供应管( 7)的流化床反应器(1、2)。为了生产具有最低能耗的高质量标准的产品,加热装置的结构应使其包括两个阶段,并至少设置一个热交换器(12)作为还原性气体的加热装置,并且与之串联连接的是带有氧气供应装置(16)的用于还原气体的部分燃烧装置(13)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号