首页>
外国专利>
Procedure for the execution of underground constructions in soft soil with high water infiltration.
Procedure for the execution of underground constructions in soft soil with high water infiltration.
展开▼
机译:在水渗透率高的软土中进行地下施工的程序。
展开▼
页面导航
摘要
著录项
相似文献
摘要
The invention relates to a procedure for the execution of underground constructions in soft soil with high water infiltration, which consists in a stage of achieving the digging with an excavator, under a self setting bentonitic mud, which replaces the soft soil with an artificial rock created by the hardened mud, after which in this formed rock a ditch is created having the width of the construction, thus creating a vat with walls and bottom, eliminating water infiltration and depending on the height, the walls of the vat may be lined.
展开▼