so far, not the type of construction method of bridge of the geodetic points, in the occurrence of the torque rod, and the construction can be put in the place with remote sensing of the occurrence of cracks in the concrete of the structure of the uc654uace0 is all powerful and and durability.;this invention is a method of continuous beam bridge construction and maintenance and management of the site, the installation and maintenance, at the central point as a key section of the bottom plate concrete and curing on the snow, the little one point of time section of the site the compressive stress of the introduction of the live load, and the occurrence of the torque in the port, to prevent lateral cracks can be continuous beam bridge construction method, branch and the rise in the amount more than the amount to win, at the time of uac8cud558 section 2 car of the stress of the point of it.;this invention is a method of a three span continuous beam bridge is more similar to the same methods can be applied.
展开▼