FIELD: mining industry. SUBSTANCE: method can be used in development of diamond deposits by combination method. According to method, simultaneously with formation of benches in opencast operations and recovering of kimberlite, driven are bore-holes, cross headings and basic workings in first level down to boundary of permafrost zone. Level is divided in sublevels starting from design boundary of opencast operations. In sublevel, ore body is divided into strips and driven in them are ventilation and delivery drifts of increased cross-section. Drifts are connected to each other by vertical bore-holes which are widened by means of bore-hole explosive charges so as to create compensation spaces. Total amount of ore in procedure must not exceed 12-20%. Application of aforesaid method allows for ensuring stable functioning of mine when opencast operations are stopped due to climatic conditions with normal operation of concentration plant without opencast work in compliance with preset plan. As compensation spaces are enlarged in number, they are eliminated by exploding bore-hole charges in pillars between spaces. Overcompressed ore obtained in this case is subjected to shrinkage. On completion of opencast operations, ore subjected to shrinkage is released from all sublevels of block through bottom located at boundary of permafrost zone. Carried out is proportioned vibration release of ore into sectional proportioning devices with bottom discharge and reciprocating motion. Thus, created in kimberlite pipe space is common flow with horizontally moving surface. Freed stoping space is filled with ice and mine production tailings. EFFECT: higher efficiency. 12 dwg
机译:领域:采矿业。实质:该方法可用于结合法开发钻石矿床。根据该方法,在露天作业中形成板凳和金伯利岩采收的同时,从第一层一直到永久冻土带的边界带动钻孔,十字cross头和基本作业。从露天运营的设计边界开始,将级别划分为多个子级别。在地下,将矿体分成条带,并在其中驱使横截面增大的通风和输送漂移。漂移通过垂直钻孔相互连接,这些垂直钻孔通过钻孔炸药加宽,从而形成补偿空间。程序中的矿石总量不得超过12-20%。通过上述方法的应用,可以确保由于气候条件露天矿停止运行而使矿山稳定运行,而选矿厂的正常运行无需按照预设计划进行露天矿。随着补偿空间数量的增加,通过在空间之间的柱中爆炸钻孔装药来消除补偿空间。在这种情况下获得的过压缩矿石会发生收缩。露天作业完成后,遭受收缩的矿石从位于永久冻土带边界的底部的所有子层通过底部释放。进行矿石的成比例的振动释放,并通过底部排出和往复运动将其振动释放到分段式配料装置中。因此,在金伯利岩管空间中产生的是具有水平运动面的共同流动。自由的停放空间充满了冰和矿山生产尾矿。效果:更高的效率。 12载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号