首页> 外国专利> Heat force of the clockwork with a gas turbine and a steam generator for a more pressure - steam turbine

Heat force of the clockwork with a gas turbine and a steam generator for a more pressure - steam turbine

机译:带有燃气轮机和蒸汽发生器的发条的热力,压力更高-蒸汽轮机

摘要

For the development of a high pressure steam, at least two overheating stages (10-12) are used in series, fitted with an injection cooling (26,27). For an intermediate pressure steam, at least two intermediate pressure stages (13,14) are used with an injection cooler (28). The end stages (12,14) of the high and intermediate pressure systems are located at the same section of the boiler (9), with their pipes aligned alternately among each other in a comb-shaped layout. The intermediate pressure steam stage (13) is between or after the first two high pressure steam stages (10,11). The first burner (6), using the exhaust of the gas turbine, is at the boiler (9) near the end stages (12,14) of the high and intermediate pressure systems. A second burner (25) is at the boiler (9) in front of the high pressure steamer (21). The first burner (6) is controlled according to the steam temp. at the outlet of the first intermediate pressure stage (13), and the second burner (25) is controlled according to the high pressure loading.
机译:为了产生高压蒸汽,至少串联使用了两个过热级(10-12),配有喷射冷却装置(26,27)。对于中压蒸汽,至少两个中压级(13,14)与喷射冷却器(28)一起使用。高压和中压系统的末级(12,14)位于锅炉(9)的同一部分,它们的管道以梳状布置彼此交替排列。中压蒸汽段(13)在前两个高压蒸汽段(10,11)之间或之后。利用燃气轮机的排气,第一燃烧器(6)在锅炉(9)的高压和中压系统的末级(12,14)附近。第二燃烧器(25)在高压蒸锅(21)前面的锅炉(9)处。根据蒸汽温度控制第一燃烧器(6)。在第一中压级(13)的出口处,第二燃烧器(25)根据高压负荷被控制。

著录项

  • 公开/公告号DE19734862C2

    专利类型

  • 公开/公告日1999-08-05

    原文格式PDF

  • 申请/专利权人 GERICKE BERND 51067 KÖLN DE;

    申请/专利号DE1997134862

  • 发明设计人 GERICKE BERND 51067 KÖLN DE;

    申请日1997-08-12

  • 分类号F02C6/18;F22B35/06;F22B31/04;

  • 国家 DE

  • 入库时间 2022-08-22 02:13:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号