Heat force of the clockwork with a gas turbine and a steam generator for a more pressure - steam turbine
Heat force of the clockwork with a gas turbine and a steam generator for a more pressure - steam turbine
展开▼
机译:带有燃气轮机和蒸汽发生器的发条的热力,压力更高-蒸汽轮机
展开▼
页面导航
摘要
著录项
相似文献
摘要
For the development of a high pressure steam, at least two overheating stages (10-12) are used in series, fitted with an injection cooling (26,27). For an intermediate pressure steam, at least two intermediate pressure stages (13,14) are used with an injection cooler (28). The end stages (12,14) of the high and intermediate pressure systems are located at the same section of the boiler (9), with their pipes aligned alternately among each other in a comb-shaped layout. The intermediate pressure steam stage (13) is between or after the first two high pressure steam stages (10,11). The first burner (6), using the exhaust of the gas turbine, is at the boiler (9) near the end stages (12,14) of the high and intermediate pressure systems. A second burner (25) is at the boiler (9) in front of the high pressure steamer (21). The first burner (6) is controlled according to the steam temp. at the outlet of the first intermediate pressure stage (13), and the second burner (25) is controlled according to the high pressure loading.
展开▼