首页> 外国专利> Is used for the application manner and this application manner of the high yield cast-in-place concrete pile and the like the tightening compacting post

Is used for the application manner and this application manner of the high yield cast-in-place concrete pile and the like the tightening compacting post

机译:用于高产量现浇混凝土桩等的紧固方式的施加方式和该施加方式

摘要

PURPOSE: To improve a compaction effect, and to increase the bearing power of a front end by penetrating a compaction pile while blowing out cement milk and pulling up a penetrating rod while leaving the compaction pile into a ground and blowing out cement milk. ;CONSTITUTION: A compaction pile 3 is inserted into a guide pipe 2 installed to a bored hole 1 or a precast pile erected into the bored hole 1 by a penetrating rod 8, and made to reach a supported ground 11. The compaction pile 3 is penetrated up to desired depth while being rotated by the penetrating rod 8, and cement milk 9..., etc., are blown out from the back of a cutter, etc., mounted at the front end section of the compaction pile 3 at the same time, and impregnated into the supported ground 11. The compaction pile 3 is detached from the penetrating rod 8 and left in the support ground 11, and the penetrating rod 8 is pulled up simultaneously while blowing out cement milk 9, etc., from the front end of the penetrating rod 8. A section up to a specified level in the guide pipe 2 or the precast pile is filled with cement milk 9, etc.;COPYRIGHT: (C)1993,JPO&Japio
机译:目的:为了提高压实效果,并通过在吹出水泥浆的同时穿透压实桩并在将压实桩留在地下并吹出水泥浆的同时拉起穿透杆来提高前端的承载力。 ;组成:压实桩3插入到安装在钻孔1中的导管2或通过穿透杆8竖立到钻孔1中的预制桩中,并到达支撑地面11。压实桩3是在穿透杆8旋转的同时穿透至所需深度,并且将水泥奶9 ...等从安装在压实桩3的前端部处的切刀等的后部吹出。同时,将其浸入支撑地面11中。将压实桩3从穿透杆8上取下并留在支撑地面11中,同时向上拉穿透杆8,同时吹出水泥浆9等。从穿透杆8的前端开始。在导管2或预制桩中直至指定高度的部分填充水泥浆9等。版权所有:(C)1993,JPO&Japio

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号