PROBLEM TO BE SOLVED: To simplify the timbering of a horizontal overhang floor system frame form and omit wires, rods, flush type fixtures, etc., in constructing a steel bridge having a small number of main girders. ;SOLUTION: Large beams 15 and 15 are built over in the axis direction of a bridge in parallel with and adjacent to each other, large span truss materials 18 and 18 are built at ends of both beams 15 and 15, the timbering 19 of an overhang section floor system form is hung, and a beam 30 is thrown over between the outer frames 19 and 19 of both sides with specified strength and rigidity reinforced by utilizing a substance comprising scaffold hanging pieces or support pipes 31 prefabricated in a factory as support members for the cross-beam 7 of the outer frame 19 provided at the corner sections of the web of the cross-beam 7 and an upper flange 8 and a lower flange 8. Then, when passing through between bridge piers, an upper horizontal beam 22' abutting on the dolly block between the end section of the upper horizontal beam 22' and a bridge pier by utilizing the scaffold piece or the support pipe 31 is removed to avoid the interference of the bridge pier and the outer frame 19 to smoothly move the outer frame 19 of a concrete floor system form overhang section.;COPYRIGHT: (C)2000,JPO
机译:要解决的问题:在建造具有少量主梁的钢桥时,为了简化水平悬挑地板系统框架的构架,并省略电线,杆,齐平式固定装置等。 ;解决方案:大梁15和15在桥梁的轴线方向上彼此平行且彼此相邻地构建,大跨度桁架材料18和18分别在梁15和15的两端构建,木构架19悬挂悬臂式地板系统形式,并且通过利用包括在工厂中预制的脚手架悬挂件或支撑管31的物质作为支撑构件,将梁30以规定的强度和刚度在两侧的外部框架19和19之间投掷。对于设置在横梁7的腹板的拐角部分处的外框19的横梁7,以及上凸缘8和下凸缘8。然后,当穿过桥墩之间时,上水平梁22通过使用脚手架件或支撑管31,将抵接在上部水平梁22的端部和桥墩之间的台车上的垫块'去除,以避免桥墩和外框架19的干扰而使之平滑。将混凝土地板系统的外框19从悬垂部分移动。版权所有:(C)2000,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号