首页> 外国专利> Method of construction of a vault, bearing piece and half-shell for construction of the vault

Method of construction of a vault, bearing piece and half-shell for construction of the vault

机译:拱顶的构造方法,拱顶的支承件和半壳体

摘要

The tunnel is made from a series of prefabricated halfshells (1, 2) with their lower ends set in sole plate channels and their upper ends recessed to receive a key of a cast concrete material. Before the key is cast the upper ends of the half-shells are fitted with temporary thrust assemblies (30, 50) which leave a gap in the base (14) of the recess between the half-shells' projecting edges (22). Once the key has been cast and has set the thrust assemblies are removed and the load transferred to the key.
机译:隧道由一系列预制的半壳(1、2)制成,它们的下端设置在底板通道中,其上端凹入以容纳混凝土制的钥匙。在铸造钥匙之前,半壳的上端装有临时止推组件(30、50),该组件在凹槽的底部(14)中在半壳的突出边缘(22)之间留有间隙。一旦钥匙被铸造并固定好,推力组件就被移除,载荷转移到钥匙上。

著录项

  • 公开/公告号AU4233299A

    专利类型

  • 公开/公告日2000-02-24

    原文格式PDF

  • 申请/专利权人 FREYSSINET INTERNATIONAL (STUP);

    申请/专利号AU19990042332

  • 发明设计人 PIERRE ORSAT;

    申请日1999-07-28

  • 分类号E02D29/05;

  • 国家 AU

  • 入库时间 2022-08-22 01:51:49

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号