method of forming stepped on my career, including the drilling of vertical wells with upstream on the u043du0438u0436u0435u043bu0435u0436u0430u0449u0438u0439 ledge along the eyebrows with the establishment of u0442u043du043eu0441u0438u0442u0435u043bu044cu043du043e eyebrows u043fu0435u0440u0435u0431u0443u0440u0430 u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge in the first row of wells from the repose of the ledge, the placement of u0434u0435u043cu043fu0444u0438u0440u0443u044eu0449u0435u0433u043e material on the face of the wells with subsequent u0432u0437u0440u044bu0432u0430u043du0438u0435u043c propellants, the formation of u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge.with the fact that, in order to increase the resilience of which are stepped through the prevention of the destruction of the site and repose u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge over weir u0445u043du0435u0439 u0431u0440u043eu0432u043au043eu0439 u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge without u043fu0435u0440u0435u0431u0443u0440u0430 drilling several wells, u0434u0435u043cu043fu0444u0438u0440u0443u044eu0449u0438u0439 material housed in the wells of the number and value of u043fu0435u0440u0435u0431u0443u0440u0430 hu0432 front row u043au0432u0430u0436u0438u043d determine of u0432u044bu0440u0430u0436u0435u043du0438u044fu0433u0434u0435 a distance between wells in a rowm; b is the distance between the rows of wells, m; u03d5 angle internal friction rock under dynamic load, grad.
展开▼