首页> 外国专利> method of forming stepped on my career

method of forming stepped on my career

机译:形成方法踩我的职业

摘要

method of forming stepped on my career, including the drilling of vertical wells with upstream on the u043du0438u0436u0435u043bu0435u0436u0430u0449u0438u0439 ledge along the eyebrows with the establishment of u0442u043du043eu0441u0438u0442u0435u043bu044cu043du043e eyebrows u043fu0435u0440u0435u0431u0443u0440u0430 u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge in the first row of wells from the repose of the ledge, the placement of u0434u0435u043cu043fu0444u0438u0440u0443u044eu0449u0435u0433u043e material on the face of the wells with subsequent u0432u0437u0440u044bu0432u0430u043du0438u0435u043c propellants, the formation of u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge.with the fact that, in order to increase the resilience of which are stepped through the prevention of the destruction of the site and repose u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge over weir u0445u043du0435u0439 u0431u0440u043eu0432u043au043eu0439 u043du0438u0436u0435u043bu0435u0436u0430u0449u0435u0433u043e ledge without u043fu0435u0440u0435u0431u0443u0440u0430 drilling several wells, u0434u0435u043cu043fu0444u0438u0440u0443u044eu0449u0438u0439 material housed in the wells of the number and value of u043fu0435u0440u0435u0431u0443u0440u0430 hu0432 front row u043au0432u0430u0436u0438u043d determine of u0432u044bu0440u0430u0436u0435u043du0438u044fu0433u0434u0435 a distance between wells in a rowm; b is the distance between the rows of wells, m; u03d5 angle internal friction rock under dynamic load, grad.
机译:在我的职业生涯中逐步形成方法,包括在 u043d u0438 u0436 u0435 u043b u0435 u0436 u0430 u0449 u0438 u0439沿眉毛沿上游钻垂直井,并建立了 u0442 u043d u043e u0441 u0438 u0442 u0435 u043b u044c u043d u043d眉毛 u043f u0435 u0440 u0435 u0431 u0443 u0440 u0430 u0430 u043d u0438 u0436 u0435 u043b u0436 u0430 u0449 u0435 u0433 u043e从窗台的休憩处移至第一行井架中, u0434 u0435 u043c u043f u0444 u0438 u0440 u0443 u0443 u044e u0449 u0435 u0433 u043e孔表面的材料,随后是 u0432 u0437 u0440 u044b u0432 u0430 u043d u0438 u0435 u043c推进剂,形成 u043d u0438 u0436 u0436 u0435 u043b u0435 u0436 u0430 u0449 u0435 u0433 u043e壁架,其目的是为了提高其弹性,逐步防止站点的破坏并安放 u043d u0438 u0436 u0435 u043b u0435 u0436 u0430 u0449 u0435 u 0433 u043e堰上的壁架 u0445 u043d u0435 u0439 u0431 u0440 u043e u0432 u043a u043e u0439 u043d u043d u0438 u0436 u0435 u043b u0435 u0436 u0430 u0449 u0435 u043e壁架,没有 u043f u0435 u0440 u0435 u0431 u0443 u0440 u0430钻几个井, u0434 u0435 u043c u043f u0444 u0438 u0440 u0443 u0443 u044e u0449 u0438 u0438 u0439在 u043f u0435 u0440 u0435 u0431 u0443 u0440 u0430 h u0432前排 u043a u0432 u0430 u0436 u0438 u043的数量和值的孔中确定 u0432 u044b u0440 u0430 u0436 u0435 u043d u0438 u044f u0433 u0434 u0435行中各孔之间的距离; b是孔行之间的距离,m; u03d5动载荷下角内摩擦岩石,梯度。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号