首页> 外国专利> Construction site scaffolders aid employs setdown or hanger clips taking handrail and scaffold tube for in erection and dismantling routines.

Construction site scaffolders aid employs setdown or hanger clips taking handrail and scaffold tube for in erection and dismantling routines.

机译:工地脚手架辅助装置采用固定架或吊夹,将扶手和脚手架管用于安装和拆卸程序。

摘要

An erection and dismantling aid (1) consists of central tube (2) fitted with a handrail (4) setdown and/or hanger (3) and first and second (5,6) clips to hang the aid (1) on the axis of the tube (2) in an offset arrangement so as to partly encircle the vertical scaffold etc element. Equipment elements (5,6) can also come in bow form and welded to the 195-205 cm long central tube (2). A push-on and slide-in stringer is also provided with flattened and drilled ends and of length 120-150% of the spacing between two vertical scaffold elements. The handrail (4) is held slidably at one end on the set down or hanger or placed at the far end on the aid fittings. Two vertical scaffold tubes are placed on or removed from the scaffolding and the handrail set on the scaffold elements as appropriate.
机译:架设和拆卸辅助装置(1)由装有扶手(4)固定装置和/或吊架(3)的中央管(2)以及将辅助装置(1)悬挂在轴上的第一和第二个夹子(5,6)组成管(2)的端部以偏置布置布置,以部分地包围竖直支架等元件。设备元件(5,6)也可以呈弓形,并焊接到195-205厘米长的中心管(2)上。推入式和滑入式桁条还设有扁平端和钻孔端,长度为两个垂直脚手架元件之间间距的120-150%。扶手(4)的一端可滑动地保持在放下装置或悬挂器上,或者远端放置在辅助配件上。将两个垂直脚手架管放在脚手架上或从脚手架上取下,并将扶手适当地固定在脚手架上。

著录项

  • 公开/公告号DE19900113A1

    专利类型

  • 公开/公告日2000-07-27

    原文格式PDF

  • 申请/专利权人 PLETTAC AG;

    申请/专利号DE1999100113

  • 发明设计人 SCHOULA MANFRED;HASEK JIRI;

    申请日1999-01-05

  • 分类号E04G1/26;

  • 国家 DE

  • 入库时间 2022-08-22 01:42:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号