The rapid running-up and load-raising process involves raising the fuel mass flow supplied to the plant, and at the same time supplying an auxiliary working medium such as water or steam to the turbine to flow through it, so that the load gradient is steeper for the same maximum permissible temperature gradient and the required load is reached more rapidly.