首页> 外国专利> Rapid running-up and load raising process for gas turbine plant, involving raising fuel mass flow supplied to plant and at same time supplying auxiliary working medium to turbine

Rapid running-up and load raising process for gas turbine plant, involving raising fuel mass flow supplied to plant and at same time supplying auxiliary working medium to turbine

机译:燃气轮机工厂的快速启动和负荷增加过程,包括提高供给工厂的燃料质量流量,同时向涡轮机提供辅助工作介质

摘要

The rapid running-up and load-raising process involves raising the fuel mass flow supplied to the plant, and at the same time supplying an auxiliary working medium such as water or steam to the turbine to flow through it, so that the load gradient is steeper for the same maximum permissible temperature gradient and the required load is reached more rapidly.
机译:快速启动和增加负荷的过程涉及增加供应给工厂的燃料质量流量,同时向涡轮提供辅助工作介质(例如水或蒸汽)以使其流动,从而使负荷梯度为在相同的最大允许温度梯度下,倾斜角度更陡峭,所需负载更快地达到。

著录项

  • 公开/公告号DE19902437A1

    专利类型

  • 公开/公告日2000-07-27

    原文格式PDF

  • 申请/专利权人 ABB ALSTOM POWER (SCHWEIZ) AG BADEN;

    申请/专利号DE1999102437

  • 发明设计人 BLATTER RICHARD;LIEBIG ERHARD;

    申请日1999-01-22

  • 分类号F02C9/26;F02C3/30;

  • 国家 DE

  • 入库时间 2022-08-22 01:42:20