PURPOSE: To supply stable power and further to attain smooth switching from existing line specification to new Shinkansen line specification by providing a tap, switching trolley wire voltage to the new Shinkansen line specification and to the existing line specification, in an autotransformer of 1:n system. ;CONSTITUTION: In the case of running an existing line electric rolling stock 6 on a rail 5 of existing line specification, power supply voltage of 55kV is supplied as the existing line specification from a substation 1 accross a trolley wire 2 and a feeder wire 3. A switching tap 7 of an autotransformer 4 is left as switched to a side of an existing line specification contact B. In the case of switching to new Shinkansen line specification, the power supply voltage of the substation 1 is switched to 63kV, and the switching tap 7 is switched to a new Shinkansen line specification contact A. Even before and after switching by the switching tap 7, since voltage between rail/feeder is fixed to switch only trolley wire voltage matched with the existing line/new Shinkansen line, changing the power supply voltage from the substation is only required by a voltage difference 8kV between the existing line specification and the new Shinkansen line specification.;COPYRIGHT: (C)1995,JPO
机译:目的:通过在1:n的自耦变压器中提供抽头,切换台车线电压到新的新干线规格和现有的线规格,以提供稳定的电源并进一步实现从现有的线规格到新的新干线规格的平稳切换。系统。 ;组成:在现有线路规格的轨道5上运行现有线路电气机车车辆6的情况下,55kV电源电压作为现有线路规格从变电站1架设在架空电线2和馈电线3上。在切换至新的新干线线路规格的情况下,将变电站1的电源电压切换至63kV,并且将自耦变压器4的切换抽头7切换至现有线路规格触点B的一侧。切换抽头7切换到新的新干线规格触点A。即使在切换抽头7切换之前和之后,由于导轨/馈线之间的电压是固定的,因此只能切换与现有线路/新新干线匹配的架空线电压。变电站的供电电压仅需满足现有线路规格与新的新干线线路规格之间的8kV电压差。版权所有:(C)1995,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号