首页> 外国专利> Crane and dismantlement manner null for dismantlement of construction work elevator

Crane and dismantlement manner null for dismantlement of construction work elevator

机译:起重机和拆除方式对建筑工程电梯的拆除无效

摘要

PROBLEM TO BE SOLVED: To provide a construction elevator support dismantling crane that can dismantle construction elevator supports safely and provide a dismantling method. ;SOLUTION: A portal frame 3 is erected on a carrier 2 elevated being supported by supports 1, and a fixed rail 4 is fixedly provided at the upper part of the portal frame 3. A moving rail 6 is provided to traverse in the portal frame 3 being supported by the fixed frame 4, and a motor-driven chain block 8 is provided to traverse in the portal frame 3 being supported by the moving rail 6. The moving rail 6 is slided, or the motor-driven chain block 8 is slided to take in the supports 1 without turning a crane.;COPYRIGHT: (C)1998,JPO
机译:要解决的问题:提供一种可以安全地拆卸施工升降机支架并提供拆卸方法的施工升降机支架拆卸起重机。 ;解决方案:门架3竖立在由支架1支撑的高架托架2上,固定导轨4固定设置在门架3的上部。移动导轨6设置为在门架中横穿。如图3所示,在由固定框架4支撑的图3中,设置有在从动轨道6支撑的门框3中横动的电动链块8。使移动轨道6滑动​​,或者将电动链块8滑动。滑动以在不转动起重机的情况下取下支架1。版权所有:(C)1998,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号