In the shaft arrival opening of the shielded tunnelling machine dead water structure and the arrival penetration construction method
In the shaft arrival opening of the shielded tunnelling machine dead water structure and the arrival penetration construction method
展开▼
机译:盾构掘进机死水结构竖井进洞口及进洞施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To make it possible to cut off water in a shaft arrival opening by allowing a shield excavator to penetrate slidingly while keeping the adherence of the foam urethane layer poured into a space formed of a ring-shaped frame body provided to the circumferential part in front of the shield excavator. ;SOLUTION: Foam urethane provided with expansibility, elasticity and adhesive efficiency is sprayed on the inside circumference 21 of a wall in an arrival opening formed by excavating the face to form a foam urethane layer 22 in the arrival opening. A filling space 35 formed of a frame body 24 constituted in the shape of a ring is filled with 16 units to form a foam urethane layer 23 in an excavator. Cut-off efficiency in the arrival opening 15 can be economically and easily ensured by driving forward and sliding the shield excavator 12 again.;COPYRIGHT: (C)1997,JPO
展开▼