首页> 外国专利> WATERPROOFING CONSTRUCTION METHOD FOR BALLAST TRACK FLOOR SLAB IN ELEVATED RAILROAD BRIDGE AND POURING DEVICE FOR AQUEOUS WATERPROOF AGENT USED IN THE SAME

WATERPROOFING CONSTRUCTION METHOD FOR BALLAST TRACK FLOOR SLAB IN ELEVATED RAILROAD BRIDGE AND POURING DEVICE FOR AQUEOUS WATERPROOF AGENT USED IN THE SAME

机译:铁路桥梁高架桥道ACK楼板的防水施工方法及相同防水剂的浇筑装置。

摘要

PROBLEM TO BE SOLVED: To efficiently waterproof a ballast track floor slab surface in an elevated railroad bridge. ;SOLUTION: In a construction method in which aqueous waterproof agent of rubber asphalt emulsion is poured into ballast on a floor slab of the elevated railroad bridge, a rotary shaft 9 of a rotary driving machine 4 is connected with an upper face of a pouring pipe 1 provided with 8 spiral 5 on an outer side face, the rotary driving machine 4 is gripped to fit and rotate the pouring pipe 1 from an upper face of the ballast, the rotary driving machine 4 is removed from the pouring pipe 1 when a tip part of the pouring pipe 1 reaches a predetermined depth of the ballast, and aqueous waterproof agent of rubber asphalt emulsion is poured from an open part on the upper face of the pouring pipe 1 to diffuse, permeate, and solidify the aqueous waterproof agent on an upper face of the floor slab so as to provide a waterproofing construction method for ballast track floor slab in the elevated railroad bridge.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:为了有效地防水高架铁路桥梁中道ball轨道地板的板面。 ;解决方案:在将橡胶沥青乳液的水性防水剂倒入高架铁路桥楼板的道ball中的施工方法中,旋转驱动机4的旋转轴9与浇注管的上表面连接如图1所示,在外侧面上具有8个螺旋​​5的旋转驱动机4从压载物的上表面被抓握以使倾倒管1装配并旋转,当尖端被从倾倒管1移除时,旋转驱动机4被从倾倒管1移除。浇注管1的一部分到达压载物的预定深度,并且从浇注管1的上表面的开口部分浇注橡胶沥青乳液的水性防水剂以使水性防水剂扩散,渗透并固化。地板的上表面,为高架铁路桥梁的道ast轨道地板提供防水施工方法。;版权所有:(C)2001,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号