PURPOSE: To make it possible to restore a floor level easily by jacking up a minimum amount of reinforced concrete block slabs of an uppermost layer which has been subjected to uneven settlement and injecting grout into the produced. ;CONSTITUTION: When uneven settlement is generated on a dirt floor concrete slab 1, a floor level is measured three-dimensionally, thereby determining a minimum construction block slab for the uppermost layer of a reinforced concrete slab 2. Then, the site concrete is cut up to the top of a middle layer of concrete mat slab 3 where a central jack support hole 6 and a lifting bolt threaded hole 7 around its peripheral edge are after-worked. Then, a reaction force receiver 60 is installed to the hole 6 and a jack 61 is interposed. A lifting mount 8 is loaded where lifting bolts 70 are threaded with the holes 7, thereby connecting the bolts 70 to the lifting mount 8. The jack 61 is arranged to rise, thereby jacking the concrete block 20 by way of the lifting mount 8. Then, mortar is groutinjected in the space 9 from a mortar injection hole 8.;COPYRIGHT: (C)1995,JPO
机译:目的:通过顶起最小量的最上层钢筋混凝土砌块楼板,使其易于恢复地板水平,该最上层已经受不均匀沉降,并向产品中注入水泥浆。 ;构成:当在肮脏的地面混凝土板1上产生不均匀沉降时,通过三维测量地板高度,从而确定钢筋混凝土板2的最上层的最小建筑砌块板。然后,切割现场混凝土直到混凝土垫层板3的中间层的顶部,后部是中央千斤顶支撑孔6和围绕其外围边缘的起重螺栓螺纹孔7。然后,将反作用力接收器60安装到孔6并且插入千斤顶61。举升架8被加载,其中举升螺栓70穿过孔7,从而将螺栓70连接到举升架8。千斤顶61布置成上升,从而通过举升架8顶起混凝土块20。然后,将砂浆从砂浆注入孔8注入空间9中。版权所有:(C)1995,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号