首页> 外国专利> POWER PLANT OPERATION MANAGEMENT SYSTEM

POWER PLANT OPERATION MANAGEMENT SYSTEM

机译:电厂运行管理系统

摘要

PROBLEM TO BE SOLVED: To surely back up centralized management. ;SOLUTION: Operation management centers 2A to 2C store operation management information. When a fault of, for example, the operation management center 2B is detected, a central power feed command center 1 informs the operation management centers 2A, 2B, and 2C of fault information through a transmission line D01. The normal operation management center 2A and operation management center 2C switches the operation management information and performs operation management so that a substitute operation management center acts as the faulty operation management center 2B by using predetermined condition data.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:确保备份集中管理。 ;解决方案:运营管理中心2A至2C存储运营管理信息。当检测到例如操作管理中心2B的故障时,中央供电命令中心1通过传输线D01将操作信息通知操作管理中心2A,2B和2C。正常运行管理中心2A和运行管理中心2C切换运行管理信息并执行运行管理,以使替代运行管理中心通过使用预定条件数据充当故障运行管理中心2B。版权所有:(C)2001,JPO

著录项

  • 公开/公告号JP2001042925A

    专利类型

  • 公开/公告日2001-02-16

    原文格式PDF

  • 申请/专利权人 TOSHIBA CORP;

    申请/专利号JP19990213701

  • 发明设计人 WAKIMOTO HIROMI;OTSUKA SHIRO;

    申请日1999-07-28

  • 分类号G05B23/02;G05B15/02;H02J3/00;H02P9/00;

  • 国家 JP

  • 入库时间 2022-08-22 01:29:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号