PROBLEM TO BE SOLVED: To provide a base isolation underground continuous wall, and a base isolation construction method and a base-isolated building using the base isolation underground continuous wall. ;SOLUTION: This base isolation underground continuous wall to be used is provided with an underground continuous wall constructed in the ground, and a base isolation mechanism 3 connected to the top end 1a of the underground continuous wall 1.;COPYRIGHT: (C)2001,JPO
展开▼