首页> 外国专利> PULLING-OUT CONSTRUCTION METHOD FOR CASING UNIT PIPE IN BORING CONSTRUCTION WORK

PULLING-OUT CONSTRUCTION METHOD FOR CASING UNIT PIPE IN BORING CONSTRUCTION WORK

机译:钻孔施工中套管施工的拉出施工方法。

摘要

PROBLEM TO BE SOLVED: To eliminate the need for a large amount of labor and cost required for a material and its treatment because a consolidated fluid as a large amount of industrial waste is discharged with anchor construction works. ;SOLUTION: A mounting material 11 composed of a steel wire or the like is inserted into the casing unit pipe 2 after excavation in fixed depth by the casing unit pipe, a packer device 13 is installed at the rear end of the material 11, packers 12 are shrunk, and a consolidated fluid S is squeezs-pumped into the casing unit pipe 2 from a supply inlet 10, pulling out the casing unit pipe 2 gradually, and pressure-grouted into a drilled pit. Air is squeeze-pumped into the casing unit pipe 2 from the supply inlet 10 under the state in which the casing unit pipe 2 is pulled out from a pit-port cutoff device 5 by one unit pipe 2', the consolidated fluid S is pushed in, the packers 12 are expanded to close the end section of the casing unit pipe 2, and the casing unit pipe 2' at the rear of the end section of the pipe 2 is detached and removed. The same process is repeated.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:消除材料和材料处理所需的大量劳力和成本,因为固结流体作为大量工业废物通过锚固建筑工程排出。 ;解决方案:由钢丝等制成的安装材料11在通过套管单元管道进行固定深度的挖掘之后插入到套管单元管道2中,在物料11的后端安装了封隔器装置13收缩图12所示的状态,将固结液S从供给口10压入到壳体单元管2内,并逐渐拉出壳体单元管2,并进行压力灌浆到钻孔中。在通过一个单元管2'将壳体单元管2从进水口切断装置5拉出的状态下,从供给口10将空气从供给口10压入到壳体单元管2中,推动固结流体S。如图1所示,封隔器12膨胀以封闭壳体单元管2的端部,并且在管2的端部后部的壳体单元管2′被拆卸和移除。重复相同的过程。版权所有:(C)2001,JPO

著录项

  • 公开/公告号JP2001049655A

    专利类型

  • 公开/公告日2001-02-20

    原文格式PDF

  • 申请/专利权人 APEX:KK;

    申请/专利号JP19990223735

  • 发明设计人 SATO MASARU;

    申请日1999-08-06

  • 分类号E02D3/12;

  • 国家 JP

  • 入库时间 2022-08-22 01:28:04

相似文献

  • 专利
  • 外文文献
  • 中文文献