WORK EXECUTION METHOD OF REFERENCE ELECTRODE FOR GROUNDING ACCIDENT DECISION, AND REFERENCE ELECTRODE FOR GROUNDING ACCIDENT DECISION

机译:接地事故决策参考电极的工作执行方法,以及接地事故决策参考电极的工作执行方法

摘要

PROBLEM TO BE SOLVED: To provide an enforcing method of a reference electrode capable of judging whether or not a grounding accident of a buried electric wire is generated in a substrate premise and a reference electrode therefor. SOLUTION: A predetermined current flows between an electrode installed at a position far from a substation and an earth mat buried in the substation premise and a potential distribution at each point of the substation premise is measured to set a standard electrode-providing position. Next, a tip end electrode 3a is hit in the standard electrode-providing position and a providing depth is subsequently increased while adding a step earth 3b. The step earth 3b is covered with an insulation cylinder (shield) 3e formed by a vinyl chloride resin, etc. When a target potential difference is ensured between the earth mat and the reference electrode, an insulation material 3f is poured between the step earth 3b and the insulation cylinder 3e and a water-proof cap 3g is covered on an upper end. An electrode previously coated by an insulation material can be also used as the standard electrode.
机译:解决的问题:提供一种参考电极的实施方法,该方法能够判断在基板前提中是否发生了埋入电线的接地事故。解决方案:预定电流在远离变电站的位置安装的电极与埋在变电站房屋内的接地垫之间流动,并测量变电站房屋每个点的电位分布,以设置标准的电极提供位置。接下来,在标准电极设置位置处敲击尖端电极3a,并且随后在增加台阶接地3b的同时增加提供深度。阶梯接地3b被由氯乙烯树脂等形成的绝缘筒(屏蔽)3e覆盖。当确保接地垫和基准电极之间的目标电位差时,在阶梯接地3b之间注入绝缘材料3f。绝缘筒3e和防水盖3g覆盖在其上端。预先用绝缘材料涂覆的电极也可以用作标准电极。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号