首页> 外国专利> assembly type tower crane for power transmission tower

assembly type tower crane for power transmission tower

机译:输电塔装配式塔吊

摘要

The present invention relates to a prefabricated tower crane for a transmission tower. The conventional construction of a transmission tower using a mobile crane vehicle and a transmission tower construction method using a winch have not only a construction of a transmission tower in a mountain and a narrow area, but also a problem that the construction work is not easy.;Therefore, the present invention provides a base end (1) provided in the central portion between the four base A, B, C, D (11) (12) (13) (14); A support (2) on which the lower end is rotatably coupled to the support shaft (21) on the base end (1); A crane equipped with a tower mast 31 is inserted into the support frame 22 installed on the upper side of the support 2, the boom 32 having an auxiliary boom 32A at the front end is provided on the upper side A main body 3; A support (4) having a lower end rotatably coupled to the hinge shaft (40) on the other end (1) of the support (2); The winch 51 is provided on the lower back side of the support 2, and the pulleys A, B, C, D 52, 53 (on both sides of the upper end of the support 2 and the upper ends of the support 4, respectively) 54 and 55 are installed to drive the drive wires 56 drawn from the winch 51 to the strut 2 via the pulleys A, B, C, D 52, 53, 54, 55. A first driving part 5 fixed thereto; A trolley E 61 is provided on the rear side between the trolleys B and C 53 and 54, and the bases B and C 12 and 13 are formed on the first support wire 62 through the trolley E 61. A first support part 6 fixed to the head; Second support portion for fixing the second support wire 70, one end of which is fixed to the front and rear sides of the upper end of the support (2) to the base A, B, C, D (11) (12) (13) (14) (7); Lifting pulleys A and B (80A) and (80B) are installed on both sides of the lower end of the tower mast 31 to pull the drive wires 56 drawn from the winch 51 to pulley A (52), lifting pulley A (80A), The transmission tower consists of a pulley B, C (53) (54), hoistway B (80B), and a second driving part (8) fixed to the support (2) via the pulley D (55). Not only is construction possible, but it also has the effect of widening the choice of regions for selecting transmission towers.;In addition, it is possible to construct a transmission tower by raising the reinforcing steel frame in a state in which the crane is positioned at the desired height as described above, thereby increasing the simplicity of the work and the speed and efficiency of the work.
机译:用于传输塔的预制塔式起重机技术领域本发明涉及一种用于传输塔的预制塔式起重机。使用移动式起重机车辆的输电塔的传统构造和使用绞车的输电塔的建造方法不仅具有在山区和狭窄区域中建造输电塔的构造,而且还存在建造工作不容易的问题。因此,本发明提供了一种基端(1),其设置在四个基部A,B,C,D(11)(12)(13)(14)之间的中央部分中;下端可旋转地连接至基端(1)上的支撑轴(21)的支撑(2);将装备有塔桅杆31的起重机插入安装在支撑件2的上侧的支撑框架22中,在上侧A主体3上设置在前端具有辅助吊臂32A的吊臂32。支撑件(4)的下端可旋转地连接至支撑件(2)的另一端(1)上的铰链轴(40);绞盘51设置在支撑件2的下后侧,滑轮A,B,C,D 52、53(分别位于支撑件2的上端和支撑件4的上端的两侧)上。 )54和55被安装以经由绞盘A,B,C,D 52、53、54、55将从绞盘51拉出的驱动线56驱动到支柱2。在小车B和C 53与54之间的后侧上设置有小车E 61,并且基架B和C 12和13通过小车E 61形成在第一支撑线62上。第一支撑部6固定至头部;用于固定第二支撑线70的第二支撑部分,该第二支撑线的一端固定在支撑件(2)的上端的前侧和后侧,并固定到基座A,B,C,D(11)(12)( 13)(14)(7);提升滑轮A和B(80A)和(80B)安装在塔架桅杆31下端的两侧,以将从绞车51拉出的驱动线56拉到滑轮A(52),提升滑轮A(80A)传动塔由皮带轮B,C(53)(54),井道B(80B)和经由皮带轮D(55)固定在支撑件(2)上的第二驱动部件(8)组成。不仅可以进行构造,而且还具有扩大选择输电塔的区域的选择的效果。;另外,可以通过在起重机定位的状态下升高钢筋框架来建造输电塔。如上所述,将其以期望的高度设置在适当的高度,从而增加了工作的简便性以及工作的速度和效率。

著录项

  • 公开/公告号KR100310991B1

    专利类型

  • 公开/公告日2001-10-17

    原文格式PDF

  • 申请/专利权人 NULL NULL;

    申请/专利号KR19990019856

  • 发明设计人 김윤호;

    申请日1999-05-31

  • 分类号B66C21/00;

  • 国家 KR