(57) Abstract Topic Procurement cost of device and inexpensive of running costSimplification of conversion and handling of the car and safe accomplishment of land mine demolition work definiteAt the place where preservation and topography are complicated and the place where it has irregularity it sweeps, the muAnd others if possible suppression and the like of generation. SolutionsAs for land mine blast central processing unit, caterpillar 2 having,At the same time radio remote manipulation the run body 1 which possibly is formed and the said runIn hull 3 of the body in top and bottom direction fluctuation unrestrictedly the device mutually is done parallelAt the same time in the front the brattice swing arm 4 of the left and right pair which is done and, saidThe top and bottom fluctuation feature 5 which fluctuates the swing arm to top and bottom directionAs with, multiple hanging tools 7 are supported, the said swingYou removed between the region of each toe of switch approaching of the arm and were installed possiblyIn abscissa the water being restoration 6 and inside, aforementioned hanging toolThe plastic make container 8 which was hung respectively and the emptyTo become, the said container through the aforementioned swing arm, in top and bottom directionTo fluctuate, at the time of the downward moving of the said container at the cartridge head embedding in the earth,Way it can blast this in the land mine which the te is including the shock,It is constituted.
展开▼