首页> 外国专利> Construction manner null of the shaft and the new material concrete wall which use the new material precast

Construction manner null of the shaft and the new material concrete wall which use the new material precast

机译:使用新材料预制件的竖井和新材料混凝土墙的施工方式无效

摘要

PURPOSE: To easily construct a vertical shaft for a shield machine by forming a wall body with new raw material precast concrete arranged with carbon fibers and other steel members at a groove section excavated while slurry is mixed, then solidifying the slurry. ;CONSTITUTION: A NOMST precast member 1 prestressed with a new raw material 13 made of carbon fibers in the horizontal direction is provided on a main body 3 made of precast concrete, and its width is set to about 1/2 of the opening width of a shield machine. A steel sheet pile 25, an H-steel 27, a pair of NOMOST members 1-1, 1-2, and a waling H-steel are arranged in a groove excavated while slurry such as bentonite is mixed. A chemical is injected to solidify the slurry, then the shield machine is installed and pressed to the wall face. The H-steels 27, 29 are removed, the NOMST members 1-1, 1-2 are directly excavated with the shield machine to construct a shield tunnel. A vertical shaft for the shield machine to be advanced and reached can be easily constructed for the execution under a road where height is limited.;COPYRIGHT: (C)1994,JPO&Japio
机译:目的:通过在混合浆液的凹槽部分挖出的槽段中用碳纤维和其他钢构件制成的新原料预制混凝土形成墙体,从而轻松构造用于屏蔽机的垂直轴,然后使浆液固化。组成:在预制混凝土制成的主体3上,设置有水平方向用碳纤维制成的新原材料13预应力的NOMST预制构件1,其宽度设置为开口宽度的1/2左右。盾构机钢板桩25,H型钢27,一对NOMOST构件1-1、1-2和波浪状H型钢被布置在混合诸如膨润土的浆料的同时开挖的凹槽中。注入化学药品以固化浆液,然后安装防护机并将其压在墙面上。去除H型钢27、29,用屏蔽机直接挖掘NOMST构件1-1、1-2,以构造屏蔽隧道。可以很容易地构造出要到达和到达的盾构机的垂直轴,以在高度受限的道路上执行。版权所有:(C)1994,JPO&Japio

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号