首页>
外国专利>
CONSTRUCTION METHOD OF CURING WALL FOR DEMOLITION WORK AND MOVABLE CURING WALL
CONSTRUCTION METHOD OF CURING WALL FOR DEMOLITION WORK AND MOVABLE CURING WALL
展开▼
机译:拆除工程围墙及移动式围墙的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To shorten a period for assembly and demolition work, decrease human burdening and reduce costs, and also to avoid works at a higher place.;SOLUTION: In a side excluding one of a heavy machine for a demolition work portion of a building, a curing wall covering a work portion is built. Following the development of a demolition work, this is moved to a required portion to make a curing wall. The curing wall is built up with a plurality of assembled unit bodies. Then, it is built up to a required height by raising other unit bodies step by step with a base unit body as a foundation. Meanwhile, a required width of the curing wall can be obtained by combining the unit bodies together in the horizontal direction. Thus, making the curing wall as a general use small-size unit makes it available at a cheaper cost and by an easier transportation.;COPYRIGHT: (C)2002,JPO
展开▼