首页>
外国专利>
Guaranteeing completion times for batch jobs without static partitioning
Guaranteeing completion times for batch jobs without static partitioning
展开▼
机译:无需静态分区即可保证批处理作业的完成时间
展开▼
页面导航
摘要
著录项
相似文献
摘要
A batch job scheduler facility schedules batch jobs in a general purpose multiprocessor system having resources, such as processors and memory, and running interactive and batch jobs. The resources are allocated to the batch jobs. Completion times are calculated and guaranteed for the batch jobs based on the resources allocated to the batch jobs. The completion times are calculated and guaranteed without static partitioning, resulting in improved utilization of system resources. Batch-critical batch jobs are defined which require all their allocated resources to complete by their guaranteed completion time. The batch jobs are scheduled so that batch jobs and interactive jobs compete for the same resources. Batch-critical jobs are permitted to obtain all their allocated resources.
展开▼