首页>
外国专利>
METHOD FOR PLANNING FACE CLEANING WORKS IN A TECTONICALLY STRESSED DEPOSIT FIELD, IN PARTICULAR, IN A COAL DEPOSIT
METHOD FOR PLANNING FACE CLEANING WORKS IN A TECTONICALLY STRESSED DEPOSIT FIELD, IN PARTICULAR, IN A COAL DEPOSIT
展开▼
机译:在构造应力较大的矿床中,特别是在煤矿床中进行洗面工作的计划方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The aim of the invention is to improve the reliability of a process for planning face working operations in a tectonically stressed sedimentation deposit such as a hard coal deposit by determining the working direction, working length, working speed and working sequence. To that end, the face working operations to be planned should be oriented in accordance with the course, course length and breadth of detected seam erosions and projected seam erosions in the body of the deposit based on the tectemechanical process associated with the folding energy and tectonic energy.
展开▼