首页> 外国专利> Prevention of approach slab settlement by applying non-com paction abutment backfilling method

Prevention of approach slab settlement by applying non-com paction abutment backfilling method

机译:采用非压紧基台回填法防止进近平板沉降

摘要

PURPOSE: A minimizing method for the settlement of an approach slab using non-tamp bridge backing method is provided to construct easily, to reduce the cost of construction, to secure a bridge user's safety and comfort on a bridge, to extend the life of a bridge and to maintain easily by minimizing the settlement of an approach slab. CONSTITUTION: The minimizing method for the settlement of an approach slab using a non-tamp bridge backing method comprises the steps of: completing an abutment sphere(20) by placing footing concrete(10), then installing a separation shed(53) on the lowermost part of the backing part of the abutment sphere; paving backing materials(52) without tamping at the appointed interval from the abutment sphere; installing a separation shed not to mix a general banking area(56) adjacent to the backing part paved without tamping by the preinstalled non-tamp backing materials, then back-filling to the equal height to the preinstalled non-tamp backing materials; after backing to the target height repeatedly, constructing an abutment part(20) by placing an upper girder; and installing a drainage system(55) to the non-tamp backing section at need.
机译:目的:提供一种使用非夯桥背衬法沉降进近板的最小化方法,以易于施工,降低施工成本,确保桥梁使用者在桥梁上的安全性和舒适性,延长桥的使用寿命。通过最小化进场平板的沉降来架桥和轻松维护。组成:采用无夯实的桥梁支撑方法沉降进近板的最小化方法包括以下步骤:通过放置基础混凝土(10)来完成桥基球体(20),然后在桥墩上安装分隔棚(53)基台球背衬部分的最低部分;在与基台球之间的指定间隔内不夯实地铺砌背衬材料(52);安装隔离棚,以免与铺砌的衬砌部分相邻的一般堤岸区域(56)混合在一起,而不会被预先安装的非捣固衬砌材料夯实,然后回填至与预先安装的非捣固衬砌材料相同的高度;反复回到目标高度后,通过放置上梁来构建桥台(20)。并在需要时将排水系统(55)安装到非夯实衬背部分。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com