首页> 外国专利> System and method for object oriented ERP project implementation

System and method for object oriented ERP project implementation

机译:面向对象的erp项目实施系统和方法

摘要

The present invention is 5 view (View) to express object-oriented enterprise resource management in project development, different number of functional and non-functional and organizational perspectives are integrated is gathered by the computer control through the process of going through to the consistency checks It seeks to ensure that all the needs of your macro and micro enterprise resource management system can more accurately represented. According to one embodiment of the invention, the operation requires that the test target information receives the definition data, analysis data and design data to perform the integrity test with a first step of user selection of the desired method, the parameters and properties; A second step of performing a simulation on the data integrity on the basis of the result selected in the first step; A third step of deriving a non-matching parts on the basis of rules and consistency between the name of the data to be calculated as; And a fourth step of modifying the non-matching portion derived from the third step; And a fifth step of storing the modified data in the fourth step in the database storage unit; And a sixth step of receiving the modified data from the fifth stage to perform scheduling, quality control, and project management, and training in project management control of management; Then, the data stored in the database storage unit, receives the process execution result and the new data of the project, the control management unit, wherein the user comprises a seventh step of processing the data in accordance with said event time to generate a specific event object-oriented is provided enterprise resource planning project development method.
机译:本发明是表示项目开发中的面向对象的企业资源管理的五视图(View),通过进行一致性检查的过程由计算机控制来收集不同数量的功能性和非功能性以及组织性的观点。它旨在确保您的宏观和微观企业资源管理系统的所有需求都能得到更准确的体现。根据本发明的一个实施例,该操作要求测试目标信息接收定义数据,分析数据和设计数据,以通过用户选择所需方法,参数和特性的第一步来执行完整性测试。第二步,根据第一步选择的结果,对数据完整性进行仿真;第三步,根据规则和要计算的数据名称之间的一致性得出不匹配的部分;第四步骤,修改第三步骤得到的不匹配部分;第五步骤,将第四步骤中的修改后的数据存储在数据库存储单元中;第六步,从第五阶段接收修改后的数据,以进行调度,质量控制和项目管理,并对项目管理中的管理控制进行培训;然后,存储在数据库存储单元中的数据接收过程执行结果和项目的新数据,即控制管理单元,其中用户包括根据所述事件时间处理数据以生成特定信息的第七步骤。面向事件的事件提供了企业资源计划项目开发方法。

著录项

  • 公开/公告号KR100341393B1

    专利类型

  • 公开/公告日2002-06-21

    原文格式PDF

  • 申请/专利权人 NULL NULL;

    申请/专利号KR19990048441

  • 发明设计人 박화규;백종명;

    申请日1999-11-03

  • 分类号G06F9/44;

  • 国家 KR

  • 入库时间 2022-08-22 00:29:36

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号